The installation of photovoltaic panels in a heritage conservation area is subject to a binding opinion from the Regional Heritage Office (KPÚ),

Photovoltaics in 2026: The simplification under the Building Act does not apply in heritage conservation areas. What are the risks and obligations?

Loading

The installation of solar panels is experiencing a huge boom. This is driven not only by the drive for energy self-sufficiency, but also by new legislation that has cut red tape. However, many investors and property owners are labouring under a dangerous misconception. They believe that, because the new Building Act allows them to install photovoltaic systems without a permit, they can do so anywhere. An official decision by the Public Prosecutor’s Office from June 2026 shows, however, that you will come up against a brick wall in heritage areas.

Animal repellent with a loudspeaker and control unit
Repellents (or deterrents) are chemical substances, mixtures, or electronic and mechanical devices designed to repel or deter unwanted animals, insects and other pests, or prevent their access to a defined area. Their main purpose is to protect human dwellings, gardens, crops or property in a humane way, without the need to kill or injure the animal. They work by creating unpleasant stimuli that prompt pests to leave the protected area voluntarily.

In this article, we will examine a significant legal conflict between the Building Act and the Act on the Protection of the Heritage Fund, which could result in a hefty fine or an order to dismantle an expensive system for an uninformed member of the public.


Myth: No paperwork is required for systems up to 50 kW

The new Building Act (Act No. 25/2025 Z. z.) has brought about a significant simplification for homeowners (Public Prosecutor’s Office… p. 1). In the case of small-scale installations (up to 10.8 kW) or systems up to 50 kW, a planning permission is generally not required for their installation, nor is it even necessary to notify the planning authority (Public Prosecutor’s Office… p. 1). The condition is that the appearance of the building is not significantly altered, the load-bearing structures are not affected, and the use of the building is not changed (Public Prosecutor’s Office… p. 1).

On this basis, many believe that if the building authority makes no demands, heritage conservationists have no legal grounds to intervene in the process (Public Prosecutor’s Office… p. 1). However, this is a serious error of judgement.

Reality: The Heritage Act as a lex specialis

In its latest notice dated 11 June 2026 (file reference Kd 136/26/1100-6), the Bratislava Regional Public Prosecutor’s Office has definitively confirmed that the Act on the Protection of the Heritage Fund (No. 49/2002 Coll.) is regarded as lex specialis (a specific legal provision) in relation to the Building Act (Public Prosecutor’s Office… pp. 1, 4).

According to the Roman legal principle ‘lex specialis derogat legi generali’, specific legislation takes precedence over general legislation (Public Prosecutor’s Office… p. 4). In practice, this means: whilst the Building Act simplifies matters for the whole of the Slovak Republic, the Heritage Act may impose stricter requirements in protected areas (Public Prosecutor’s Office… pp. 1, 4).

Whilst building law focuses on technical safety, functionality and land-use development, heritage law uncompromisingly protects historical and cultural values (Public Prosecutor’s Office… p. 4).

Why do heritage conservationists object to solar panels?

Advertisements

A cultural monument and its surroundings are defined not only by the materials used, but also by their visual and compositional arrangement (the shape of the roofs, their pitch and surface finish) (Public Prosecutor’s Office… p. 5).

Photovoltaic systems fundamentally disrupt these characteristics due to their surface area, design, angle of inclination and, in particular, their degree of light reflection (Public Prosecutor’s Office… p. 5). According to the Public Prosecutor’s Office and heritage authorities, incorrectly positioned photovoltaic systems may:

  • To detract from the appearance or skyline of protected settlements (Public Prosecutor’s Office… p. 6).
  • To compromise the visual integrity of historic green spaces, parks and gardens (Public Prosecutor’s Office… p. 6).
  • Adversely affect the appearance of the so-called ‘roofscape’ and façades (Public Prosecutor’s Office… p. 6).

It therefore makes no difference whatsoever whether it is a small micro-source of up to 10.8 kW on a detached house or a large-scale system – every single installation in a heritage area is subject to an individual expert assessment (by the public prosecutor’s office… pp. 5–6).


What are your obligations as a property owner in 2026?

If you are planning to install solar panels and your property is subject to heritage protection, you must submit an application to the relevant Regional Heritage Office (KPÚ) before commencing work (Public Prosecutor’s Office… p. 5):

  1. If you own a National Cultural Monument (NKP): You must apply for a Decision on the Intended Restoration (Public Prosecutor’s Office… p. 3). This obligation also applies to activities which are not normally subject to notification under the Building Regulations (Public Prosecutor’s Office… p. 3).
  2. If the house is situated within a heritage area (reserve or zone): You are required to apply for a Decision on the proposed alteration of a property within a heritage area (Public Prosecutor’s Office… p. 3).
  3. If you are within the monument’s protection zone: You must request a binding opinion from the Regional Monuments Board and attach a specification of the changes in area and layout (Public Prosecutor’s Office… p. 4).

What are the risks of carrying out the installation incorrectly?

If you carry out the installation without a valid decision from the heritage authorities, the Regional Office for the Protection of Cultural Monuments (KPÚ) has the legal authority to immediately initiate administrative proceedings and order you to cease work immediately (Public Prosecutor’s Office… p. 3). You run the risk of incurring heavy financial penalties for damaging the heritage fund and, in extreme cases, the state may order you to dismantle the solar system at your own expense (Public Prosecutor’s Office… pp. 2–3).

Conclusion and recommendations for practice

Energy independence is important, but the protection of cultural heritage takes precedence over simplified planning procedures under Slovak law (Public Prosecutor’s Office… p. 4). If you live in a historic town centre, a village conservation area or near a castle or church, always contact the heritage authority before purchasing any equipment (Public Prosecutor’s Office… pp. 3–4). The Slovak Heritage Authority has issued a binding ‘Methodology for Photovoltaic Systems’, which specifies exactly where and under what conditions (e.g. the use of matt panels that blend in with the roof covering) the integration of solar panels is acceptable (Public Prosecutor’s Office… p. 1).